Second track of Divača-Koper railway line – Action 3 (construction of tunnel T8 and viaducts V1 and V2)
On 8 September 2020, the European Commission approved co-funding for the project of construction of the Second track Divača-Koper, namely for the construction of the tunnel T8 and viaducts V1 and V2. The project is a encompassing the construction of 4.9 km of newly built viaducts and tunnels without equipment. EU’s Cohesion Fund is contributing EUR 80 000 000 through the “Operational Programme for the Implementation of the EU Cohesion Policy” for the 2014-2020 programming period.