Preparation of documentation for the second section of Third Development Axis – South
The project "Preparation of documentation for the 2nd section of the 3rd development axis south, on the section from the Maline connection to the international border crossing Metlika and to the Črnomelj south connection" includes the preparation of documentation for the entire second section of the third development axis south, which is divided into three subsections:
A - 8 kilometers from the Maline junction to the Metlika - north junction,
B - 2.5 km from the Metlika - north connection to the Metlika border crossing and
C - 20 kilometers from the Gradnik fork to Črnomelj - south.
The total cost of the project is EUR 8 million of which EUR 2.15 million was co-financed from the European Regional Development Fund.
A - 8 kilometers from the Maline junction to the Metlika - north junction,
B - 2.5 km from the Metlika - north connection to the Metlika border crossing and
C - 20 kilometers from the Gradnik fork to Črnomelj - south.
The total cost of the project is EUR 8 million of which EUR 2.15 million was co-financed from the European Regional Development Fund.